Submission Documents: Application No.0519/FUl/12 - Erection of a 61m high (to blade tip) wind turbine at Ormiston Farm, Kirknewton (herewith)
This is the list of documents available for the submission Application No.0519/FUl/12 - Erection of a 61m high (to blade tip) wind turbine at Ormiston Farm, Kirknewton (herewith).
Click on the links to view the individual documents in PDF format.
Name | Type of Document | Access | View Document |
Item Minute - 19 December 2012 | Minute | Public |
(23 KB) |
0519 Ormiston Farm Wind Turbine - public.pdf | Report | Public |
(4.74 MB) |